Psomas
Psomas is the other party on 1 approved Board action that names Bloomington, from March 28, 2023 through March 28, 2023. Recorded spending is ≥ $299,700.
How this is counted
Each line is one amount those minutes recorded. A reduction is shown as a lower price, and the document is the file that states it. Read 160 of 183 minutes files. 1 of 4,814 recorded costs are in this total for Bloomington.
- Recorded spend in Bloomington
- ≥ $299,700
- Read 160 of 183 minutes files. 1 of 4,814 recorded costs are in this total for Bloomington.
- Line items
- 1
- 0 with a contract number
What the minutes describe
- Professional landscape architectural and engineering design services contract for Kessler Park Dream Field Project.
Line items
Each amount is what that action recorded.
| Date | Amount | Kind | What | Document |
|---|---|---|---|---|
| March 28, 2023 | $299,700.00 | Spending | Professional landscape architectural and engineering design services contract for Kessler Park Dream Field Project. Item 64. b. Approve a professional landscape architectural and engineering design and services contract with Psomas in the amount of $299,700 for the design of construction plans and specifications and provide bidding and construction support services to Bloomington Recreation and Park District, for the Kessler Park Dre… |