Angeles Contractor Inc

The county paid $3,874,504 to this name in fiscal year 2020, across 98 payments.

All vendors

How this is counted

The totals are the county checkbook, grouped by department and account. Payment lines are the individual rows behind that total: date, fund, account, description, and invoice. A Board agenda item is listed when its title names this party. The agenda is the board’s record. The checkbook is the payment record. They are not the same document.

By department

DepartmentAccountPaidPayments
Facilities ManagementCapital Assets$3,037,77759
Facilities ManagementServices and Support$762,38436
Economic Development AgencyServices and Support$74,3443

Payment lines

The latest payments in fiscal year 2020. Checkbook rows

DateDepartmentFundAccountDescriptionInvoiceAmount
June 12, 2020Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital Projects2278Q-3$69,222
June 12, 2020Facilities Management10000 General FundProject Cost Expenses2278E-3F$8,952
June 12, 2020Facilities Management10000 General FundProject Cost Expenses2278P1-02$2,062
June 10, 2020Economic Development Agency21200 County Free LibraryMaint-Building and Improvement2245I-2$15,906
June 10, 2020Economic Development Agency21200 County Free LibraryMaint-Building and Improvement2245I-1$54,720
June 10, 2020Economic Development Agency21200 County Free LibraryMaint-Building and Improvement2245I-3F$3,717
June 10, 2020Facilities Management10000 General FundProject Cost Expenses2278P-03F$3,250
June 1, 2020Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital Projects2278B-1$114,634
May 19, 2020Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital Projects2278Q-2$115,581
May 19, 2020Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital Projects2278Q-1$54,781
May 14, 2020Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital Projects2278G-2F$9,825
May 1, 2020Facilities Management10000 General FundProject Cost Expenses2278R-1$62,284
April 16, 2020Facilities Management10000 General FundProject Cost Expenses2278E-2$50,498
April 14, 2020Facilities Management10000 General FundProject Cost Expenses2278P1-01$39,179
April 1, 2020Facilities Management10000 General FundProject Cost Expenses2278P-02$30,983
April 1, 2020Facilities Management10000 General FundProject Cost Expenses2278P-01$30,766
April 1, 2020Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital Projects2278J-1$292,963
March 25, 2020Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital Projects2234K-03F$2,815
March 25, 2020Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital Projects2278JI-1$15,869
March 20, 2020Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital Projects2264E-7$56,516
March 20, 2020Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital Projects2234DD-4F$1,614
March 20, 2020Facilities Management30104 Indio Jail Expansion - AB900Buildings-Capital Projects2278M1-1$7,931
March 11, 2020Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital Projects17F$71,342
March 1, 2020Facilities Management30104 Indio Jail Expansion - AB900Buildings-Capital Projects2278M-1$50,110
February 13, 2020Facilities Management10000 General FundProject Cost Expenses2278D-3F$2,262
February 13, 2020Facilities Management10000 General FundProject Cost Expenses2278L1-2F$564
February 4, 2020Facilities Management10000 General FundProject Cost Expenses2278F-2F$139
February 4, 2020Facilities Management10000 General FundProject Cost Expenses2278N-1$25,545
February 1, 2020Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital Projects2264E-6$220,261
February 1, 2020Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital Projects2234DD-3$829
February 1, 2020Facilities Management10000 General FundProject Cost Expenses2278L-2F$5,746
February 1, 2020Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital Projects2264E-5$327,242
February 1, 2020Facilities Management10000 General FundProject Cost Expenses2278E-1$119,582
January 6, 2020Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital Projects2234DD-2$24,807
January 2, 2020Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital Projects2234GG-5$5,192
January 2, 2020Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital Projects2234GG-6RET$9,963
January 2, 2020Facilities Management10000 General FundProject Cost Expenses2278L1-1$10,707
December 23, 2019Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital Projects2234A2-2F$587
December 23, 2019Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital Projects2234L-2F$1,033
December 23, 2019Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital Projects2234A2-1$11,143

Board items naming this vendor

DateItemAmountAgenda
October 6, 2026

FACILITIES MANAGEMENT AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System – Community Health Centers – Indio Neighborhood Health Clinic Storage Room Remodel Project – Approval of Revised Project Budget, Approval of Change Orders No. 2 and No. 3 and Approval of Notice of Completion for Angeles Contractor, Inc.; District 4. [$15,000 – 100% CHC Enterprise Fund 40090] (4/5 Vote Required) (Clerk to Record Notice of Completion)

[$15,000 – 100% CHC Enterprise Fund 40090]

$15,000Item
July 28, 2026

FACILITIES MANAGEMENT (FM) AND PROBATION DEPARTMENT: Indio Juvenile Hall Administration Roof Replacement Project – Approval of Revised Project Budget and Approval of Notice of Completion for Angeles Contractor, Inc.; District 4. [$157,000 - 100% Capital Improvement Program Fund 30700] (Clerk to Record Notice of Completion)

[$157,000 - 100% Capital Improvement Program Fund 30700]

$157,000Item
August 26, 2025

FACILITIES MANAGEMENT (FM): Riverside County Fairgrounds Second Modular Restroom Project - Approval of Revised Project Budget and Approval of Notice of Completion for Angeles Contractor, Inc.; District 4. [$45,000 – 100% National Date Festival Fund 22200] (Clerk to Record Notice of Completion)

[$45,000 – 100% National Date Festival Fund 22200]

$45,000Item
December 10, 2024

FACILITIES MANAGEMENT (FM) AND RIVERSIDE COUNTY EXECUTIVE OFFICE: Indio Law Library Relocation Project - Approval of Construction Contract with Angeles Contractor, Inc; District 4. [Total Cost $1,166,352 - 100% Capital Improvement Program Fund 30700] (Previously Approved Budget)

[Total Cost $1,166,352 - 100% Capital Improvement Program Fund 30700]

—Item
December 3, 2024

FACILITIES MANAGEMENT AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System - Community Health Centers - Indio Neighborhood Health Clinic Storage Room Remodel Project - Approval of Revised Project Budget and Approval of Construction Contract for Angeles Contractor, Inc; District 4. [$2,344,706 - 95% American Rescue Plan Act (ARPA) Funds and 5% CHC Enterprise Fund 40090]

[$2,344,706 - 95% American Rescue Plan Act (ARPA) Funds and 5% CHC Enterprise Fund 40090]

$2,344,706Item
July 2, 2024

FACILITIES MANAGEMENT (FM) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Medical Center - Elevator Upgrade Project – Approval of Revised Project Budget, Ratify and Approve Addenda No. 1-4 to the Plans and Specifications, Approval of Construction Contract with Angeles Contractor, Inc., and Approval of the Professional Services Agreement with LTJ Designs and Consulting Inc. for Inspector of Record (IOR) Services; District 5. [$839,002 - 100% RUHS Enterprise Fund 40050]

[$839,002 - 100% RUHS Enterprise Fund 40050]

$839,002Item
July 11, 2023

FACILITIES MANAGEMENT (FM): Job Order Contract No. 019 - California Environmental Quality Act Exempt, Approval of Construction Contract with Angeles Contractor, Inc.; All Districts. [$5.8 Million - 100% Interfund-Reimbursement for Services]

[$5.8 Million - 100% Interfund-Reimbursement for Services]

$6Item
August 17, 2021

FACILITIES MANAGEMENT (FM) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Cogeneration Plant Upgrade Project – Approval of Notice of Completion for Angeles Contractor, Inc. and Acceptance of the Job Orders for the Underground Conduit Replacement as Complete to Approve the Notice of Completion for Harry H. Joh Construction, Inc., District 5. [Total Cost $100,415 - Line of Credit with Banc of America reimbursed by RUHS Enterprise Fund 40050 - 100%] (Clerk to Record Noti

[Total Cost $100,415 - Line of Credit with Banc of America reimbursed by RUHS Enterprise Fund 40050 - 100%]

$100,415Item
January 26, 2021

FACILITIES MANAGEMENT AND HOUSING, HOMELESSNESS PREVENTION AND WORKFORCE SOLUTIONS: Third Street Emergency Family Shelter Renovation – Approval of Notice of Completion for Angeles Contractor, Inc., District 1. [$38,868 - Homeless Emergency Aid Program (HEAP) Capital Improvement Grant - 100%] (Clerk to Record Notice of Completion)

[$38,868 - Homeless Emergency Aid Program (HEAP) Capital Improvement Grant - 100%]

$38,868Item
January 12, 2021

FACILITIES MANAGEMENT (FM) AND PUBLIC DEFENDER AND PROBATION DEPARTMENT: Riverside Public Defender/Probation Building Project – Roof Railing Installation - Approval of Notice of Completion for Angeles Contractor, Inc., District 2. [$9,809 - Facilities Management - Project Management Office Budget - 100%] (Clerk to Record Notice of Completion)

[$9,809 - Facilities Management - Project Management Office Budget - 100%]

$9,809Item
April 21, 2020

FACILITIES MANAGEMENT (FM): United States Bankruptcy Court Lease Amendment and Renovation Project – Acceptance of the Notice of Completion for Phase III for Angeles Contractor, Inc., District 2. [$84,821 - Lease Payments from General Services Administration – 100%] (Clerk to Record Notice of Completion)

[$84,821 - Lease Payments from General Services Administration – 100%]

$84,821Item
April 7, 2020

FACILITIES MANAGEMENT (FM) AND PROBATION DEPARTMENT: Southwest Juvenile Hall Security Upgrade Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 3. [$9,825 - Probation Department General Fund - 100%] (Clerk to Record Notice of Completion)

[$9,825 - Probation Department General Fund - 100%]

$9,825Item
September 17, 2019

ECONOMIC DEVELOPMENT AGENCY (EDA): Lakeland Village Community Center Tenant Improvement Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 1. [$17,076 – Quimby Fees - 98%, Development Impact Fees Fund 30535 - Less than 2%] (Clerk to Record Notice of Completion)

[$17,076 – Quimby Fees - 98%, Development Impact Fees Fund 30535 - Less than 2%]

$17,076Item
September 10, 2019

ECONOMIC DEVELOPMENT AGENCY (EDA): AND PROBATION DEPARTMENT: Southwest Juvenile Hall Tile Replacement Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 3. [$11,767 – Probation Department General Fund - 100%] (Clerk to Record Notice of Completion)

[$11,767 – Probation Department General Fund - 100%]

$11,767Item
July 23, 2019

ECONOMIC DEVELOPMENT AGENCY (EDA): United States Bankruptcy Court Lease Amendment and Renovation Project – Approval of Lease Amendment No. 1 with the United States of America; Acceptance of the Notice of Completion for Phase I and II for Angeles Contractor, Inc.; Approval of Revised Project Budget; and Approval of Construction Contract for Phase III with Angeles Contractor, Inc., District 2. [$3,186,921 - Lease Payments from General Services Administration – 100%] (Clerk to Record Notice of Comp

[$3,186,921 - Lease Payments from General Services Administration – 100%]

$3,186,921Item
April 30, 2019

ECONOMIC DEVELOPMENT AGENCY (EDA) AND RIVERSIDE COUNTY FIRE DEPARTMENT: Riverside County Fire Department Administration Center - Approval of Revised Project Budget, Approval of Change Order No. 5 and the Notice of Completion for Angeles Contractor, Inc., District 5. [$256,789 - Fire Capital Project Fund 30300 - 100%] (Clerk to Record Notice of Completion)

[$256,789 - Fire Capital Project Fund 30300 - 100%]

$256,789Item
April 30, 2019

ECONOMIC DEVELOPMENT AGENCY (EDA) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Boiler Room Booster Pump Replacement Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 5. [$8,867 - RUHS Enterprise Fund 40050 - 100%] (Clerk to Record Notice of Completion)

[$8,867 - RUHS Enterprise Fund 40050 - 100%]

$8,867Item
April 9, 2019

ECONOMIC DEVELOPMENT AGENCY (EDA) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Exit Signs Replacement Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 5. [$20,393 - RUHS Enterprise Fund 40050 - 100%] (Clerk to Record Notice of Completion)

[$20,393 - RUHS Enterprise Fund 40050 - 100%]

$20,393Item
March 26, 2019

ECONOMIC DEVELOPMENT AGENCY (EDA) AND RIVERSIDE COUNTY FIRE DEPARTMENT: Riverside County Fire Administration Center Roof Replacement Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 5. [$15,417 – Fire Department Budget - Other Revenues-49%, General Fund–51%] (Clerk to Record Notice of Completion)

[$15,417 – Fire Department Budget - Other Revenues-49%, General Fund–51%]

$15,417Item
December 4, 2018

ECONOMIC DEVELOPMENT AGENCY (EDA): Job Order Contract No. 011 - California Environmental Quality Act Exempt, Approval of Construction Contract with Angeles Contractor, Inc., All Districts. [$4.5 Million - Intra-Internal Charges–49%, lnterfund-Reimbursements for Services–50% and Capital Improvement Program Fund–1%] Pulled Item

[$4.5 Million - Intra-Internal Charges–49%, lnterfund-Reimbursements for Services–50% and Capital Improvement Program Fund–1%]

$5Item
November 6, 2018

ECONOMIC DEVELOPMENT AGENCY (EDA): California Energy Commission 33 Electric Vehicle Charging Stations at Various Riverside County-Owned Sites - Approval of Notice of Completion for Angeles Contractor, Inc., ALL Districts. [$11,784 – California Energy Commission Grant Fund - 53% and EDA Energy Management Budget - General Fund - 47%] (Clerk to Record Notice of Completion)

[$11,784 – California Energy Commission Grant Fund - 53% and EDA Energy Management Budget - General Fund - 47%]

$11,784Item
October 30, 2018

ECONOMIC DEVELOPMENT AGENCY (EDA) AND DEPARTMENT OF PUBLIC SOCIAL SERVICES: Desert Hot Springs Family Resource Center Remodel Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 4. [$7,298 – Federal Funds - 40.54%, State Funds - 3.45%, County Funds - 0.01%, Realign Funds - 56%] (Clerk of the Board to Record Notice of Completion)

[$7,298 – Federal Funds - 40.54%, State Funds - 3.45%, County Funds - 0.01%, Realign Funds - 56%]

$7,298Item
October 30, 2018

ECONOMIC DEVELOPMENT AGENCY (EDA) AND DEPARTMENT OF BEHAVIORAL HEALTH: Roy's Desert Resource Center Remodel Project - Approval of Notice of Completion for the Interior Demolition Work for Angeles Contractor, Inc. on Job Order Contract No. 008, District 4. [$13,434 – Mental Health Services Act Fund - 100%] (Clerk of the Board to Record Notice of Completion) Pulled Item

[$13,434 – Mental Health Services Act Fund - 100%]

$13,434Item
October 23, 2018

ECONOMIC DEVELOPMENT AGENCY (EDA) AND PROBATION DEPARTMENT: Probation Indio Juvenile Hall Generator Replacement Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 4. [$22,709 - Local Revenue Fund-Juvenile Probation Activities Growth Fund-11167 - 100%] (Clerk to Record Notice of Completion)

[$22,709 - Local Revenue Fund-Juvenile Probation Activities Growth Fund-11167 - 100%]

$22,709Item
July 31, 2018

ECONOMIC DEVELOPMENT AGENCY (EDA) AND PUBLIC SAFETY ENTERPRISE COMMUNICATION: North Mountain Communication Site Generator Replacement Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 3. [$16,760 - Riverside County Information Technology - Public Safety Enterprise Communication Operations Fund 45520 - 100%] (Clerk to Record Notice of Completion)

[$16,760 - Riverside County Information Technology - Public Safety Enterprise Communication Operations Fund 45520 - 100%]

$16,760Item
June 26, 2018

ECONOMIC DEVELOPMENT AGENCY (EDA): Banning Courthouse Reuse Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 5. [$14,733 – Existing Bond Proceeds - 100%] (Clerk to Record Notice of Completion)

[$14,733 – Existing Bond Proceeds - 100%]

$14,733Item
June 12, 2018

ECONOMIC DEVELOPMENT AGENCY (EDA) AND RIVERSIDE COUNTY INFORMATION TECHNOLOGY: Riverside County Innovation Center Tenant Improvement Parking Lot Expansion Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 2. [$10,744 - Existing CORAL Bond Funds - 100%] (Clerk to Record Notice of Completion)

[$10,744 - Existing CORAL Bond Funds - 100%]

$10,744Item
June 5, 2018

ECONOMIC DEVELOPMENT AGENCY (EDA) AND SHERIFF'S DEPARTMENT: Colorado River Station Locker Room Remodel - Approval of Notice of Completion for Angeles Contractor, Inc., District 4. [$7,806 - Patrol Budget (Sheriff's Rent-Lease Building - 33%, Sheriff's Building Improvements - 67%) - 100% General Fund] (Clerk to Record Notice of Completion)

[$7,806 - Patrol Budget (Sheriff's Rent-Lease Building - 33%, Sheriff's Building Improvements - 67%) - 100% General Fund]

$7,806Item
April 10, 2018

ECONOMIC DEVELOPMENT AGENCY (EDA) AND ASSESSOR-COUNTY CLERK-RECORDER: Fourteenth Street Chapel Repair Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 2. [$9,058 – Assessor Clerk Recorder Modernization Fund - 56%, Facility Renewal Fund – 44%] (Clerk to Record Notice of Completion)

[$9,058 – Assessor Clerk Recorder Modernization Fund - 56%, Facility Renewal Fund – 44%]

$9,058Item
December 5, 2017

ECONOMIC DEVELOPMENT AGENCY (EDA) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Generator Fuel Line Replacement Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 5. [$8,136 - RUHS Enterprise Fund 40050 - 100%] (Clerk to Record Notice of Completion)

[$8,136 - RUHS Enterprise Fund 40050 - 100%]

$8,136Item
November 14, 2017

ECONOMIC DEVELOPMENT AGENCY (EDA) AND RIVERSIDE COUNTY FIRE DEPARTMENT: Riverside County Fire Department Headquarters - Approval of Construction Contract with Angeles Contractor, Inc. and Project Budget Adjustment, District 5. [$490,000 - Fire Capital Project Fund 30300 - 100%]

[$490,000 - Fire Capital Project Fund 30300 - 100%]

$490,000Item
September 19, 2017

ECONOMIC DEVELOPMENT AGENCY (EDA) AND SHERIFF'S DEPARTMENT: Southwest Justice Center Perimeter Fence Project - Approval of Change Order No. 1 and Notice of Completion for Angeles Contractor, Inc., and Approval of Project Budget Adjustment, District 3. [$72,431 - Rst for Asset Forfeit Adjudicated - 86.19%, EDA-Project Management Office Operating Budget - 13.81%] (Clerk to File Notice of Completion)

[$72,431 - Rst for Asset Forfeit Adjudicated - 86.19%, EDA-Project Management Office Operating Budget - 13.81%]

$72,431Item
August 29, 2017

ECONOMIC DEVELOPMENT AGENCY (EDA) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Cogeneration Plant Upgrade Project – California Environmental Quality Act Exempt, Approval of Construction Contract with Angeles Contractor Inc. and Preliminary Project Budget, District 5. [$2,549,781 – Line of Credit with Banc of America reimbursed by RUHS Enterprise Fund 40050 - 100%]

[$2,549,781 – Line of Credit with Banc of America reimbursed by RUHS Enterprise Fund 40050 - 100%]

$2,549,781Item
June 6, 2017

ECONOMIC DEVELOPMENT AGENCY (EDA) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Emergency Department Modular Swing Space Office Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 5. [$7,590 - RUHS Enterprise Fund 40050 - 100%]

[$7,590 - RUHS Enterprise Fund 40050 - 100%]

$7,590Item
March 21, 2017

ECONOMIC DEVELOPMENT AGENCY (EDA): Riverside Historic Courthouse Façade Project – Approval of Notice of Completion to Angeles Contractor, Inc., District 2. [$11,638 - General Fund-Court Facilities Fund 100%]

[$11,638 - General Fund-Court Facilities Fund 100%]

$11,638Item
March 14, 2017

ECONOMIC DEVELOPMENT AGENCY (EDA): Job Order Contract No. 008 - Approval of Construction Contract with Angeles Contractor, Inc., All Districts. [$0 - Intra-Internal Charges – 49%, lnterfund-Reimbursements for Services – 50% and Capital Improvement Program Fund (Facility Renewal) – 1% ]

[$0 - Intra-Internal Charges – 49%, lnterfund-Reimbursements for Services – 50% and Capital Improvement Program Fund (Facility Renewal) – 1% ]

—Item
January 17, 2017

ECONOMIC DEVELOPMENT AGENCY (EDA) AND FIRE DEPARTMENT: Riverside County Fire Department Administration Building Project - Approval of Notice of Completion to Angeles Contractor, Inc., on Job Order Contract No. 007, District 5. [$7,851 - Capital Improvement Fund 30705 - 98%, Fire Department Budget - 2%]

[$7,851 - Capital Improvement Fund 30705 - 98%, Fire Department Budget - 2%]

$7,851Item
April 26, 2016

3-16 Indio Milestones Mental health Adult Residential Facility Improvement Project – Acceptance of the Notice of Completion and Authorize Release of Retained Funds to Angeles Contractor, Inc., 4th District. [$16,108 – State Funds 100%]

[$16,108 – State Funds 100%]

$16,108Item
March 1, 2016

3-12 Approval of Job Order Contract No. 007 with Angeles Contractor, Inc. [$0]

[$0]

—Item
February 2, 2016

3-5 Riverside County Information Technology Public Safety Enterprise Communication Toro Peak Generator Project – Acceptance of the Notice of Completion and Authorize Release of Retained Funds to Angeles Contractor, Inc., 3rd District. [$45,554 – Public Safety Enterprise Communication Fund 100%]

[$45,554 – Public Safety Enterprise Communication Fund 100%]

$45,554Item