Checkbook
Angeles Contractor Inc
How this is counted
The totals are the county checkbook, grouped by department and account. Payment lines are the individual rows behind that total: date, fund, account, description, and invoice. A Board agenda item is listed when its title names this party. The agenda is the board’s record. The checkbook is the payment record. They are not the same document.
By department
| Department | Account | Paid | Payments |
|---|---|---|---|
| Facilities Management | Capital Assets | $430,860 | 14 |
Payment lines
The latest payments in fiscal year 2027. Checkbook rows
| Date | Department | Fund | Account | Description | Invoice | Amount |
|---|---|---|---|---|---|---|
| October 19, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC021-B4-FM08938011633.10-A | $54,401 | |
| October 19, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC021-10.4-FM08270014795.00-A | $6,747 | |
| October 16, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC020.2-FM08510013651.04-C | $2,860 | |
| October 16, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC020.2-FM08510013651.00-E | $21,507 | |
| October 16, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC020.2-FM08510013651.01-B | $127 | |
| October 16, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC020.2-FM08510013652.00-E | $94,782 | |
| October 1, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC021-B.4-FM08720014653.00-B | $92,561 | |
| October 1, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC021-B.4-FM08170014336.00-B | $242,803 | |
| September 25, 2026 | Rcrmc | 40050 Riv University Health System | Improvements-Building | FM08430011940-O | $210,425 | |
| September 22, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC020.2-FM08510013652.00-D | $39,053 | |
| September 15, 2026 | Rcrmc | 40050 Riv University Health System | Improvements-Building | FM08430011940-N | $134,900 | |
| September 8, 2026 | Rcrmc | 40050 Riv University Health System | Improvements-Building | FM08430011940-L | $332,975 | |
| September 8, 2026 | Rcrmc | 40050 Riv University Health System | Improvements-Building | FM08430011940-M | $124,298 | |
| September 8, 2026 | Rcrmc | 40050 Riv University Health System | Improvements-Building | FM08430011940-K | $189,525 | |
| September 8, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | EZIQC-ACI-FM08110013493-M | $61,639 | |
| September 2, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC020-39.1-FM08260013976.00-H | $49,923 | |
| September 2, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC020-39.1-FM08260013976.01-C | $6,340 | |
| September 2, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC020-39.1-FM08260013976.02-B | $4,920 | |
| September 1, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC021-B.4-FM08720014653.00A | $75,847 | |
| September 1, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC020.2-FM08720013228M | $91,232 | |
| September 1, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | 2482J-3CO2 | $7,050 | |
| September 1, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | 2482J-2CO1 | $5,625 | |
| August 25, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC020.2-FM08510013652.00-C | $113,733 | |
| August 25, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC020.2-FM08510013652.02-A | $23,528 | |
| August 24, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | 2468G3-02F | $2,052 | |
| August 24, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | 2468G2-02F | $10,910 | |
| August 24, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | 2468A4-02F | $782 | |
| August 24, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC020.2-FM08720013228.01B | $2,161 | |
| August 12, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | 2482J-1F | $27,125 | |
| August 6, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC021-B.4-FM08170014336.00-A | $163,653 | |
| July 20, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC020.2-FM08510013651.04-B | $37,790 | |
| July 1, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC021-B.4-FM08938011633.09-B | $4,978 | |
| July 1, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC021-B4-FM08938011633.08-B | $4,619 | |
| July 1, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC021-B4-FM08938011633.03-B | $18,876 | |
| July 1, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC021-B4-FM08938011633.05-A | $7,560 | |
| July 1, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | JOC021-B4-FM08938011633.04-B | $13,092 |
Board items naming this vendor
| Date | Item | Amount | Agenda |
|---|---|---|---|
| October 6, 2026 | FACILITIES MANAGEMENT AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System – Community Health Centers – Indio Neighborhood Health Clinic Storage Room Remodel Project – Approval of Revised Project Budget, Approval of Change Orders No. 2 and No. 3 and Approval of Notice of Completion for Angeles Contractor, Inc.; District 4. [$15,000 – 100% CHC Enterprise Fund 40090] (4/5 Vote Required) (Clerk to Record Notice of Completion) [$15,000 – 100% CHC Enterprise Fund 40090] | $15,000 | Item |
| July 28, 2026 | FACILITIES MANAGEMENT (FM) AND PROBATION DEPARTMENT: Indio Juvenile Hall Administration Roof Replacement Project – Approval of Revised Project Budget and Approval of Notice of Completion for Angeles Contractor, Inc.; District 4. [$157,000 - 100% Capital Improvement Program Fund 30700] (Clerk to Record Notice of Completion) [$157,000 - 100% Capital Improvement Program Fund 30700] | $157,000 | Item |
| August 26, 2025 | FACILITIES MANAGEMENT (FM): Riverside County Fairgrounds Second Modular Restroom Project - Approval of Revised Project Budget and Approval of Notice of Completion for Angeles Contractor, Inc.; District 4. [$45,000 – 100% National Date Festival Fund 22200] (Clerk to Record Notice of Completion) [$45,000 – 100% National Date Festival Fund 22200] | $45,000 | Item |
| December 10, 2024 | FACILITIES MANAGEMENT (FM) AND RIVERSIDE COUNTY EXECUTIVE OFFICE: Indio Law Library Relocation Project - Approval of Construction Contract with Angeles Contractor, Inc; District 4. [Total Cost $1,166,352 - 100% Capital Improvement Program Fund 30700] (Previously Approved Budget) [Total Cost $1,166,352 - 100% Capital Improvement Program Fund 30700] | — | Item |
| December 3, 2024 | FACILITIES MANAGEMENT AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System - Community Health Centers - Indio Neighborhood Health Clinic Storage Room Remodel Project - Approval of Revised Project Budget and Approval of Construction Contract for Angeles Contractor, Inc; District 4. [$2,344,706 - 95% American Rescue Plan Act (ARPA) Funds and 5% CHC Enterprise Fund 40090] [$2,344,706 - 95% American Rescue Plan Act (ARPA) Funds and 5% CHC Enterprise Fund 40090] | $2,344,706 | Item |
| July 2, 2024 | FACILITIES MANAGEMENT (FM) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Medical Center - Elevator Upgrade Project – Approval of Revised Project Budget, Ratify and Approve Addenda No. 1-4 to the Plans and Specifications, Approval of Construction Contract with Angeles Contractor, Inc., and Approval of the Professional Services Agreement with LTJ Designs and Consulting Inc. for Inspector of Record (IOR) Services; District 5. [$839,002 - 100% RUHS Enterprise Fund 40050] [$839,002 - 100% RUHS Enterprise Fund 40050] | $839,002 | Item |
| July 11, 2023 | FACILITIES MANAGEMENT (FM): Job Order Contract No. 019 - California Environmental Quality Act Exempt, Approval of Construction Contract with Angeles Contractor, Inc.; All Districts. [$5.8 Million - 100% Interfund-Reimbursement for Services] [$5.8 Million - 100% Interfund-Reimbursement for Services] | $6 | Item |
| August 17, 2021 | FACILITIES MANAGEMENT (FM) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Cogeneration Plant Upgrade Project – Approval of Notice of Completion for Angeles Contractor, Inc. and Acceptance of the Job Orders for the Underground Conduit Replacement as Complete to Approve the Notice of Completion for Harry H. Joh Construction, Inc., District 5. [Total Cost $100,415 - Line of Credit with Banc of America reimbursed by RUHS Enterprise Fund 40050 - 100%] (Clerk to Record Noti [Total Cost $100,415 - Line of Credit with Banc of America reimbursed by RUHS Enterprise Fund 40050 - 100%] | $100,415 | Item |
| January 26, 2021 | FACILITIES MANAGEMENT AND HOUSING, HOMELESSNESS PREVENTION AND WORKFORCE SOLUTIONS: Third Street Emergency Family Shelter Renovation – Approval of Notice of Completion for Angeles Contractor, Inc., District 1. [$38,868 - Homeless Emergency Aid Program (HEAP) Capital Improvement Grant - 100%] (Clerk to Record Notice of Completion) [$38,868 - Homeless Emergency Aid Program (HEAP) Capital Improvement Grant - 100%] | $38,868 | Item |
| January 12, 2021 | FACILITIES MANAGEMENT (FM) AND PUBLIC DEFENDER AND PROBATION DEPARTMENT: Riverside Public Defender/Probation Building Project – Roof Railing Installation - Approval of Notice of Completion for Angeles Contractor, Inc., District 2. [$9,809 - Facilities Management - Project Management Office Budget - 100%] (Clerk to Record Notice of Completion) [$9,809 - Facilities Management - Project Management Office Budget - 100%] | $9,809 | Item |
| April 21, 2020 | FACILITIES MANAGEMENT (FM): United States Bankruptcy Court Lease Amendment and Renovation Project – Acceptance of the Notice of Completion for Phase III for Angeles Contractor, Inc., District 2. [$84,821 - Lease Payments from General Services Administration – 100%] (Clerk to Record Notice of Completion) [$84,821 - Lease Payments from General Services Administration – 100%] | $84,821 | Item |
| April 7, 2020 | FACILITIES MANAGEMENT (FM) AND PROBATION DEPARTMENT: Southwest Juvenile Hall Security Upgrade Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 3. [$9,825 - Probation Department General Fund - 100%] (Clerk to Record Notice of Completion) [$9,825 - Probation Department General Fund - 100%] | $9,825 | Item |
| September 17, 2019 | ECONOMIC DEVELOPMENT AGENCY (EDA): Lakeland Village Community Center Tenant Improvement Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 1. [$17,076 – Quimby Fees - 98%, Development Impact Fees Fund 30535 - Less than 2%] (Clerk to Record Notice of Completion) [$17,076 – Quimby Fees - 98%, Development Impact Fees Fund 30535 - Less than 2%] | $17,076 | Item |
| September 10, 2019 | ECONOMIC DEVELOPMENT AGENCY (EDA): AND PROBATION DEPARTMENT: Southwest Juvenile Hall Tile Replacement Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 3. [$11,767 – Probation Department General Fund - 100%] (Clerk to Record Notice of Completion) [$11,767 – Probation Department General Fund - 100%] | $11,767 | Item |
| July 23, 2019 | ECONOMIC DEVELOPMENT AGENCY (EDA): United States Bankruptcy Court Lease Amendment and Renovation Project – Approval of Lease Amendment No. 1 with the United States of America; Acceptance of the Notice of Completion for Phase I and II for Angeles Contractor, Inc.; Approval of Revised Project Budget; and Approval of Construction Contract for Phase III with Angeles Contractor, Inc., District 2. [$3,186,921 - Lease Payments from General Services Administration – 100%] (Clerk to Record Notice of Comp [$3,186,921 - Lease Payments from General Services Administration – 100%] | $3,186,921 | Item |
| April 30, 2019 | ECONOMIC DEVELOPMENT AGENCY (EDA) AND RIVERSIDE COUNTY FIRE DEPARTMENT: Riverside County Fire Department Administration Center - Approval of Revised Project Budget, Approval of Change Order No. 5 and the Notice of Completion for Angeles Contractor, Inc., District 5. [$256,789 - Fire Capital Project Fund 30300 - 100%] (Clerk to Record Notice of Completion) [$256,789 - Fire Capital Project Fund 30300 - 100%] | $256,789 | Item |
| April 30, 2019 | ECONOMIC DEVELOPMENT AGENCY (EDA) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Boiler Room Booster Pump Replacement Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 5. [$8,867 - RUHS Enterprise Fund 40050 - 100%] (Clerk to Record Notice of Completion) [$8,867 - RUHS Enterprise Fund 40050 - 100%] | $8,867 | Item |
| April 9, 2019 | ECONOMIC DEVELOPMENT AGENCY (EDA) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Exit Signs Replacement Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 5. [$20,393 - RUHS Enterprise Fund 40050 - 100%] (Clerk to Record Notice of Completion) [$20,393 - RUHS Enterprise Fund 40050 - 100%] | $20,393 | Item |
| March 26, 2019 | ECONOMIC DEVELOPMENT AGENCY (EDA) AND RIVERSIDE COUNTY FIRE DEPARTMENT: Riverside County Fire Administration Center Roof Replacement Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 5. [$15,417 – Fire Department Budget - Other Revenues-49%, General Fund–51%] (Clerk to Record Notice of Completion) [$15,417 – Fire Department Budget - Other Revenues-49%, General Fund–51%] | $15,417 | Item |
| December 4, 2018 | ECONOMIC DEVELOPMENT AGENCY (EDA): Job Order Contract No. 011 - California Environmental Quality Act Exempt, Approval of Construction Contract with Angeles Contractor, Inc., All Districts. [$4.5 Million - Intra-Internal Charges–49%, lnterfund-Reimbursements for Services–50% and Capital Improvement Program Fund–1%] Pulled Item [$4.5 Million - Intra-Internal Charges–49%, lnterfund-Reimbursements for Services–50% and Capital Improvement Program Fund–1%] | $5 | Item |
| November 6, 2018 | ECONOMIC DEVELOPMENT AGENCY (EDA): California Energy Commission 33 Electric Vehicle Charging Stations at Various Riverside County-Owned Sites - Approval of Notice of Completion for Angeles Contractor, Inc., ALL Districts. [$11,784 – California Energy Commission Grant Fund - 53% and EDA Energy Management Budget - General Fund - 47%] (Clerk to Record Notice of Completion) [$11,784 – California Energy Commission Grant Fund - 53% and EDA Energy Management Budget - General Fund - 47%] | $11,784 | Item |
| October 30, 2018 | ECONOMIC DEVELOPMENT AGENCY (EDA) AND DEPARTMENT OF PUBLIC SOCIAL SERVICES: Desert Hot Springs Family Resource Center Remodel Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 4. [$7,298 – Federal Funds - 40.54%, State Funds - 3.45%, County Funds - 0.01%, Realign Funds - 56%] (Clerk of the Board to Record Notice of Completion) [$7,298 – Federal Funds - 40.54%, State Funds - 3.45%, County Funds - 0.01%, Realign Funds - 56%] | $7,298 | Item |
| October 30, 2018 | ECONOMIC DEVELOPMENT AGENCY (EDA) AND DEPARTMENT OF BEHAVIORAL HEALTH: Roy's Desert Resource Center Remodel Project - Approval of Notice of Completion for the Interior Demolition Work for Angeles Contractor, Inc. on Job Order Contract No. 008, District 4. [$13,434 – Mental Health Services Act Fund - 100%] (Clerk of the Board to Record Notice of Completion) Pulled Item [$13,434 – Mental Health Services Act Fund - 100%] | $13,434 | Item |
| October 23, 2018 | ECONOMIC DEVELOPMENT AGENCY (EDA) AND PROBATION DEPARTMENT: Probation Indio Juvenile Hall Generator Replacement Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 4. [$22,709 - Local Revenue Fund-Juvenile Probation Activities Growth Fund-11167 - 100%] (Clerk to Record Notice of Completion) [$22,709 - Local Revenue Fund-Juvenile Probation Activities Growth Fund-11167 - 100%] | $22,709 | Item |
| July 31, 2018 | ECONOMIC DEVELOPMENT AGENCY (EDA) AND PUBLIC SAFETY ENTERPRISE COMMUNICATION: North Mountain Communication Site Generator Replacement Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 3. [$16,760 - Riverside County Information Technology - Public Safety Enterprise Communication Operations Fund 45520 - 100%] (Clerk to Record Notice of Completion) [$16,760 - Riverside County Information Technology - Public Safety Enterprise Communication Operations Fund 45520 - 100%] | $16,760 | Item |
| June 26, 2018 | ECONOMIC DEVELOPMENT AGENCY (EDA): Banning Courthouse Reuse Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 5. [$14,733 – Existing Bond Proceeds - 100%] (Clerk to Record Notice of Completion) [$14,733 – Existing Bond Proceeds - 100%] | $14,733 | Item |
| June 12, 2018 | ECONOMIC DEVELOPMENT AGENCY (EDA) AND RIVERSIDE COUNTY INFORMATION TECHNOLOGY: Riverside County Innovation Center Tenant Improvement Parking Lot Expansion Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 2. [$10,744 - Existing CORAL Bond Funds - 100%] (Clerk to Record Notice of Completion) [$10,744 - Existing CORAL Bond Funds - 100%] | $10,744 | Item |
| June 5, 2018 | ECONOMIC DEVELOPMENT AGENCY (EDA) AND SHERIFF'S DEPARTMENT: Colorado River Station Locker Room Remodel - Approval of Notice of Completion for Angeles Contractor, Inc., District 4. [$7,806 - Patrol Budget (Sheriff's Rent-Lease Building - 33%, Sheriff's Building Improvements - 67%) - 100% General Fund] (Clerk to Record Notice of Completion) [$7,806 - Patrol Budget (Sheriff's Rent-Lease Building - 33%, Sheriff's Building Improvements - 67%) - 100% General Fund] | $7,806 | Item |
| April 10, 2018 | ECONOMIC DEVELOPMENT AGENCY (EDA) AND ASSESSOR-COUNTY CLERK-RECORDER: Fourteenth Street Chapel Repair Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 2. [$9,058 – Assessor Clerk Recorder Modernization Fund - 56%, Facility Renewal Fund – 44%] (Clerk to Record Notice of Completion) [$9,058 – Assessor Clerk Recorder Modernization Fund - 56%, Facility Renewal Fund – 44%] | $9,058 | Item |
| December 5, 2017 | ECONOMIC DEVELOPMENT AGENCY (EDA) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Generator Fuel Line Replacement Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 5. [$8,136 - RUHS Enterprise Fund 40050 - 100%] (Clerk to Record Notice of Completion) [$8,136 - RUHS Enterprise Fund 40050 - 100%] | $8,136 | Item |
| November 14, 2017 | ECONOMIC DEVELOPMENT AGENCY (EDA) AND RIVERSIDE COUNTY FIRE DEPARTMENT: Riverside County Fire Department Headquarters - Approval of Construction Contract with Angeles Contractor, Inc. and Project Budget Adjustment, District 5. [$490,000 - Fire Capital Project Fund 30300 - 100%] [$490,000 - Fire Capital Project Fund 30300 - 100%] | $490,000 | Item |
| September 19, 2017 | ECONOMIC DEVELOPMENT AGENCY (EDA) AND SHERIFF'S DEPARTMENT: Southwest Justice Center Perimeter Fence Project - Approval of Change Order No. 1 and Notice of Completion for Angeles Contractor, Inc., and Approval of Project Budget Adjustment, District 3. [$72,431 - Rst for Asset Forfeit Adjudicated - 86.19%, EDA-Project Management Office Operating Budget - 13.81%] (Clerk to File Notice of Completion) [$72,431 - Rst for Asset Forfeit Adjudicated - 86.19%, EDA-Project Management Office Operating Budget - 13.81%] | $72,431 | Item |
| August 29, 2017 | ECONOMIC DEVELOPMENT AGENCY (EDA) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Cogeneration Plant Upgrade Project – California Environmental Quality Act Exempt, Approval of Construction Contract with Angeles Contractor Inc. and Preliminary Project Budget, District 5. [$2,549,781 – Line of Credit with Banc of America reimbursed by RUHS Enterprise Fund 40050 - 100%] [$2,549,781 – Line of Credit with Banc of America reimbursed by RUHS Enterprise Fund 40050 - 100%] | $2,549,781 | Item |
| June 6, 2017 | ECONOMIC DEVELOPMENT AGENCY (EDA) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Emergency Department Modular Swing Space Office Project - Approval of Notice of Completion for Angeles Contractor, Inc., District 5. [$7,590 - RUHS Enterprise Fund 40050 - 100%] [$7,590 - RUHS Enterprise Fund 40050 - 100%] | $7,590 | Item |
| March 21, 2017 | ECONOMIC DEVELOPMENT AGENCY (EDA): Riverside Historic Courthouse Façade Project – Approval of Notice of Completion to Angeles Contractor, Inc., District 2. [$11,638 - General Fund-Court Facilities Fund 100%] [$11,638 - General Fund-Court Facilities Fund 100%] | $11,638 | Item |
| March 14, 2017 | ECONOMIC DEVELOPMENT AGENCY (EDA): Job Order Contract No. 008 - Approval of Construction Contract with Angeles Contractor, Inc., All Districts. [$0 - Intra-Internal Charges – 49%, lnterfund-Reimbursements for Services – 50% and Capital Improvement Program Fund (Facility Renewal) – 1% ] [$0 - Intra-Internal Charges – 49%, lnterfund-Reimbursements for Services – 50% and Capital Improvement Program Fund (Facility Renewal) – 1% ] | — | Item |
| January 17, 2017 | ECONOMIC DEVELOPMENT AGENCY (EDA) AND FIRE DEPARTMENT: Riverside County Fire Department Administration Building Project - Approval of Notice of Completion to Angeles Contractor, Inc., on Job Order Contract No. 007, District 5. [$7,851 - Capital Improvement Fund 30705 - 98%, Fire Department Budget - 2%] [$7,851 - Capital Improvement Fund 30705 - 98%, Fire Department Budget - 2%] | $7,851 | Item |
| April 26, 2016 | 3-16 Indio Milestones Mental health Adult Residential Facility Improvement Project – Acceptance of the Notice of Completion and Authorize Release of Retained Funds to Angeles Contractor, Inc., 4th District. [$16,108 – State Funds 100%] [$16,108 – State Funds 100%] | $16,108 | Item |
| March 1, 2016 | 3-12 Approval of Job Order Contract No. 007 with Angeles Contractor, Inc. [$0] [$0] | — | Item |
| February 2, 2016 | 3-5 Riverside County Information Technology Public Safety Enterprise Communication Toro Peak Generator Project – Acceptance of the Notice of Completion and Authorize Release of Retained Funds to Angeles Contractor, Inc., 3rd District. [$45,554 – Public Safety Enterprise Communication Fund 100%] [$45,554 – Public Safety Enterprise Communication Fund 100%] | $45,554 | Item |