Vincor Construction Inc

The county paid $13,055,515 to this name in fiscal year 2025, across 91 payments.

All vendors

How this is counted

The totals are the county checkbook, grouped by department and account. Payment lines are the individual rows behind that total: date, fund, account, description, and invoice. A Board agenda item is listed when its title names this party. The agenda is the board’s record. The checkbook is the payment record. They are not the same document.

By department

DepartmentAccountPaidPayments
Facilities ManagementCapital Assets$9,757,22353
Sheriff DeptCapital Assets$1,914,09818
County Service AreasServices and Support$593,4705
Sheriff DeptServices and Support$357,32511
Economic Development AgencyServices and Support$353,1102
Facilities ManagementServices and Support$80,2892

Payment lines

The latest payments in fiscal year 2025. Checkbook rows

DateDepartmentFundAccountDescriptionInvoiceAmount
June 16, 2025Sheriff Dept10000 General FundImprovements-BuildingRSO-PMO-22-188-2$528,039
June 12, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO 13_1241.00$92,103
June 4, 2025Sheriff Dept10000 General FundImprovements-BuildingRSO-PMO-23-244-3$3,207
June 1, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO 2_3984.00$156,069
June 1, 2025Sheriff Dept10000 General FundImprovements-BuildingRSO-PMO-22-188-1$60,996
June 1, 2025County Service Areas32740 CSA152 Cajalco Corridor QuimbyProfessional ServicesAPPLICATION NO: 5$36,781
June 1, 2025County Service Areas32740 CSA152 Cajalco Corridor QuimbyProfessional ServicesAPPLICATION NO: 2$149,085
June 1, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO 1_1492.00$60,187
June 1, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO 15_0872$310,659
June 1, 2025County Service Areas32740 CSA152 Cajalco Corridor QuimbyProfessional ServicesAPPLICATION NO: 3$190,393
June 1, 2025County Service Areas32740 CSA152 Cajalco Corridor QuimbyProfessional ServicesAPPLICATION NO: 7$19,100
June 1, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO: 6_1776$84,116
June 1, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO 3_3984.00$57,144
June 1, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO 2_1956.00$2,930
June 1, 2025County Service Areas32740 CSA152 Cajalco Corridor QuimbyProfessional ServicesAPPLICATION NO: 1$198,110
June 1, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO 5_1776$73,769
June 1, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO 12_1241.00$77,729
May 15, 2025Sheriff Dept10000 General FundImprovements-BuildingRSO-PMO-21-089-2$191,368
May 7, 2025Economic Development Agency21735 ARP Act Coronavirus ReliefProject Cost Expenses1$176,555
May 7, 2025Economic Development Agency21735 ARP Act Coronavirus ReliefProject Cost Expenses1$176,555
May 5, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO 14_0872$118,827
May 2, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO 14_0047$27,054
May 1, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO: 11_1241$28,859
April 23, 2025Sheriff Dept10000 General FundImprovements-BuildingRSO-PMO-23-244-1$46,067
April 14, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO 2_0718.00$197,334
April 14, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO 13_0047$31,243
April 4, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO 3_0718.00$34,893
April 4, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO 9_9117$205,147
April 1, 2025Sheriff Dept10000 General FundImprovements-BuildingRSO-PMO-21-089-1$457,052
April 1, 2025Sheriff Dept10000 General FundImprovements-BuildingRSO-PMO-21-218-9$66,217
April 1, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO 5 RET_12060$47,271
March 20, 2025Sheriff Dept10000 General FundImprovements-BuildingRSO-PMO-23-245-5$17,712
March 5, 2025Facilities Management10000 General FundProject Cost ExpensesAPPLICATION NO 8_0196.00$62,201
March 1, 2025Facilities Management10000 General FundProject Cost ExpensesAPPLICATION NO 7_0196.00$18,088
March 1, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO 1_3984.00$42,108
March 1, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO 8_8144.00$57,215
March 1, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO 7_9942$47,807
March 1, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO 5_3016.00$630,650
February 3, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO 3_2060$50,230
February 1, 2025Facilities Management30100 Capital Const-Land & Bldg AcqBuildings-Capital ProjectsAPPLICATION NO 1_1956.00$55,662

Board items naming this vendor

DateItemAmountAgenda
October 20, 2026

OFFICE OF ECONOMIC DEVELOPMENT: CSA 122 Mesa Verde Water Reservoir Replacement Project– Approval of the Notice of Completion with Vincor Construction, Inc., District 4. [$83,586 - 100% American Rescue Plan Act (previously approved budget)] (4/5th Vote Required)

[$83,586 - 100% American Rescue Plan Act (previously approved budget)]

—Item
October 20, 2026

OFFICE OF ECONOMIC DEVELOPMENT: Business Revitalization Program– Approval of the Notice of Completion with Vincor Construction, Inc., All Districts. [$239,662 - 100% American Rescue Plan Act (previously approved budget)] (4/5th Vote Required)

[$239,662 - 100% American Rescue Plan Act (previously approved budget)]

—Item
June 23, 2026

FACILITIES MANAGEMENT (FM) AND TREASURER-TAX COLLECTOR: Treasurer-Tax Collector 4th Floor Restroom, Breakroom and Conference Room Renovation Project – Approval of Revised Project Budget and Notice of Completion for Vincor Construction, Inc; District 1. [$6,870 - 100% Treasurer-Tax Collector General Fund 10000] (Clerk to Record Notice of Completion)

[$6,870 - 100% Treasurer-Tax Collector General Fund 10000]

$6,870Item
April 14, 2026

OFFICE OF ECONOMIC DEVELOPMENT: Home Gardens Library Refresh Project, Phase 1 - Approval of Notice of Completion with Vincor Construction, Inc., District 2. [$27,948 - 100% ARPA (Previously Approved Budget)] (Clerk to Record Notice of Completion)

[$27,948 - 100% ARPA (Previously Approved Budget)]

—Item
January 27, 2026

Riverside University Health System- Medical Center: Nurse Call System Replacement Project - Approve Notice of Completion for Vincor Construction, Inc. for Riverside University Health System Medical Center Wide Nurse Call System Replacement Project, Phase 1, 2nd Floor, Approval of Revised Project Budget, and Approval of the Construction Contract with Vincor Construction, Inc. for Riverside University Health System Medical Center Wide Nurse Call System Replacement Project, Phase 2, 3rd and 4th Flo

[$7,922,262 - 100% RUHS Enterprise Fund 40050]

$7,922,262Item
August 26, 2025

FACILITIES MANAGEMENT (FM) AND RIVERSIDE COUNTY FIRE DEPARTMENT: Riverside County Fire Department Winchester Station 34 Expansion Project – Approval of Revised Project Budget and Approval of Construction Contract with Vincor Construction, Inc., District 3. [$1,553,843 - 100% DIF Western Riverside County Fire Facility Fund 30505]

[$1,553,843 - 100% DIF Western Riverside County Fire Facility Fund 30505]

$1,553,843Item
July 29, 2025

OFFICE OF ECONOMIC DEVELOPMENT: Woodcrest Community Park Improvement Project – Approval of Notice of Completion with Vincor Construction, Inc., District 2. [$35,946.29 - 100%-County Service Area 152 Zone B Quimby Fund 32740 (Previously approved budget)] (Clerk to Record Notice of Completion)

[$35,946.29 - 100%-County Service Area 152 Zone B Quimby Fund 32740 (Previously approved budget)]

—Item
May 20, 2025

FACILITIES MANAGEMENT (FM), AUDITOR-CONTROLLER’S OFFICE (ACO), AND RIVERSIDE COUNTY INFORMATION TECHNOLOGY: Riverside County Administrative Center Auditor-Controller 6th Floor Tenant Improvement Project - Approval of Revised Project Budget, Approval to Increase Purchase Order ITARC-0000018439 for Semetra Cutting Edge Solutions, and Approval of Change Order No. 2 and Notice of Completion for Vincor Construction, Inc.; District 1. [$275,153 – 100% Capital Improvement Program Fund 30700] (Clerk to

[$275,153 – 100% Capital Improvement Program Fund 30700]

$275,153Item
February 25, 2025

FACILITIES MANAGEMENT (FM) AND TRANSPORTATION AND LAND MANAGEMENT AGENCY (TLMA) AND ASSESSOR-COUNTY CLERK-RECORDER: Riverside County Administrative Center Transportation and Land Management Agency and Assessor-County Clerk-Recorder 2nd Floor Tenant Improvement Project – Approval of Revised Project Budget, Approval of Change Order No. 4 and Notice of Completion for Vincor Construction, Inc., District 1. [$90,000 Total Cost: $30,600 - 34% Transportation and Land Management Agency Department Fund 2

[$90,000 Total Cost: $30,600 - 34% Transportation and Land Management Agency Department Fund 20200, $27,900 – 31% Deferred Maintenance Fund 11208, $31,500 - 35% Assessor-County Clerk Recorder Conversion Fund 11077]

$90,000Item
December 17, 2024

SHERIFF-CORONER-PA: Palm Desert- Dispatch Expansion Project, Project No. RSO-PMO-22-188, Approval of In-Principle, Preliminary Project Budget and Construction Contract with Vincor Construction, Inc., All Districts. [Total Cost - $17,818,530 52% Sheriff’s Budget, 48% previously approved Development Impact Fees (DIF)]

[Total Cost - $17,818,530 52% Sheriff’s Budget, 48% previously approved Development Impact Fees (DIF)]

—Item
December 3, 2024

SHERIFF-CORONER-PA: Larry D. Smith Correctional Facility (SCF) Kitchen Modernization Project, California Environmental Quality Act Exempt per State CEQA Guidelines Sections 15301, 15302, and 15061(b)(3), Approval of In-Principle, Preliminary Project Budget and Construction Contract with Vincor Construction, Inc., All Districts. [Total Cost - $10,735,940 – 73.4% Sheriff’s Budget, 26.6% Capital Projects Fund 30704]

[Total Cost - $10,735,940 – 73.4% Sheriff’s Budget, 26.6% Capital Projects Fund 30704]

$10,735,940Item
December 3, 2024

OFFICE OF ECONOMIC DEVELOPMENT: CSA 122 Mesa Verde Water Reservoir Replacement Project – Approval of In-Principle, Approval of Construction Contract with Vincor Construction, Inc., and Total Project Budget. District 4. [$1,422,201 - 100%- ARPA Fund 21735] (CEQA Exempt) (4/5 Vote Required)

[$1,422,201 - 100%- ARPA Fund 21735]

$1,422,201Item
November 5, 2024

FACILITIES MANAGEMENT (FM) AND RIVERSIDE COUNTY FIRE DEPARTMENT: Riverside County Fire Department Station 82 Expansion Project - Approval of Additional Funds to Establish a Project Budget, and Approval of Construction Contract with Vincor Construction, Inc.; District 2. [$4,500,000 - 57% Federal Funds - American Rescue Plan Act (ARPA) Fund 21735; 43% Fire Department Budget General Fund 10000](4/5 Vote Required)

[$4,500,000 - 57% Federal Funds - American Rescue Plan Act (ARPA) Fund 21735; 43% Fire Department Budget General Fund 10000]

$4,500,000Item
September 17, 2024

FACILITIES MANAGEMENT (FM) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Inpatient Treatment Facility - Security System Upgrade Project - Approval of Revised Project Budget and Approval of Change Order No. 1 for Vincor Construction, Inc.; District 1. [$255,170, 100% RUHS Enterprise Fund 40050](4/5 Vote Required)

[$255,170, 100% RUHS Enterprise Fund 40050]

$255,170Item
July 30, 2024

OFFICE OF ECONOMIC DEVELOPMENT: Woodcrest Community Park Improvement Project, Phase 1 – Approval of Construction Contract with Vincor Construction, Inc. District 2. [$698,820 100%-County Service Area 152 Cajalco Corridor Quimby Fund 32740 (Previously approved budget)] Pulled Item

[$698,820 100%-County Service Area 152 Cajalco Corridor Quimby Fund 32740 (Previously approved budget)]

—Item
July 2, 2024

OFFICE OF ECONOMIC DEVELOPMENT: Riverside County Home Gardens Library Refresh Project, Phase 1 – Approval of Construction Contract with Vincor Construction, Inc., District 2. [$550,000 100% ARPA (Previously approved budget)]

[$550,000 100% ARPA (Previously approved budget)]

—Item
May 21, 2024

FACILITIES MANAGEMENT AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Medical Center - Riverside University Health System Medical Center Wide Nurse Call System Replacement Project, Phase 1, 2nd Floor - Approval of the Construction Contract with Vincor Construction, Inc.; District 5. [$928,722 - 100% RUHS Enterprise Fund 40050] (Previously Approved Budget)

[$928,722 - 100% RUHS Enterprise Fund 40050]

—Item
January 30, 2024

FACILITIES MANAGEMENT (FM) AND AUDITOR-CONTROLLER (ACO): Riverside County Administrative Center Auditor-Controller 6th Floor Tenant Improvement Project - Approval of the Construction Contract with Vincor Construction, Inc.; District 1. [$3,794,538 - 100% Capital Improvement Program Fund 30700] (Previously Approved Budget)

[$3,794,538 - 100% Capital Improvement Program Fund 30700]

—Item
October 31, 2023

FACILITIES MANAGEMENT (FM) AND TRANSPORTATION AND LAND MANAGEMENT AGENCY (TLMA): Transportation and Land Management Agency Elevator Fire Damage Emergency Repair Project - Approval of Revised Project Budget, Ratify and Approve Change Order No. 1 and Approve Notice of Completion for Vincor Construction, Inc.; District 1. [Total Cost $158,517– 42% TLMA Local Transportation Fund 20000, 58% County Insurance Carrier Funds] (Clerk to Record Notice of Completion) (4/5 Vote Required)

[Total Cost $158,517– 42% TLMA Local Transportation Fund 20000, 58% County Insurance Carrier Funds]

$158,517Item
October 3, 2023

FACILITIES MANAGEMENT (FM) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM - BEHAVIORAL HEALTH: 3125 Myers Street Roof Replacement Project – Approval of Construction Contract with Vincor Construction, Inc., District 1. [$1,198,359 - 100% RUHS Behavioral Health General Fund 10000 (84.8% State and 15.2% Facility Renewal funding)] (Previously approved budget)

[$1,198,359 - 100% RUHS Behavioral Health General Fund 10000 (84.8% State and 15.2% Facility Renewal funding)]

—Item
September 26, 2023

FACILITIES MANAGEMENT (FM) AND PROBATION DEPARTMENT: Riverside County Probation Department County Farm Road Remodel Project – Approval of Revised Project Budget and Construction Contract with Vincor Construction, Inc.; District 1. [$548,879 – 100% Probation Department General Fund 10000]

[$548,879 – 100% Probation Department General Fund 10000]

$548,879Item
September 12, 2023

OFFICE OF ECONOMIC DEVELOPMENT: American Rescue Plan Act Business Revitalization Program - Approval of Construction Contract with Vincor Construction, Inc., All Districts. [$4,300,000 - 100% ARPA (previously approved budget)] Pulled Item

[$4,300,000 - 100% ARPA (previously approved budget)]

—Item
May 9, 2023

FACILITIES MANAGEMENT(FM): United States District Court Lease Agreement Replacement Project - Approval of Construction Contract with Vincor Construction, Inc.; District 1. [$862,353 - 100% USDC Lease Payments through General Services Administration (GSA) Reimbursed by Federal GSA Funds (Previously approved budget)]

[$862,353 - 100% USDC Lease Payments through General Services Administration (GSA) Reimbursed by Federal GSA Funds (Previously approved budget)]

—Item
May 2, 2023

FACILITIES MANAGEMENT (FM) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM - BEHAVIORAL HEALTH: Riverside University Health System Behavioral Health Roy's Desert Springs Emergency Generator Project – Approval of Change Order No. 1 for Vincor Construction, Inc. and Approval of Revised Project Budget, District 4. [$331,854 - 100% RUHS Behavioral Health Department Budget - General Fund 10000 - State Funds]

[$331,854 - 100% RUHS Behavioral Health Department Budget - General Fund 10000 - State Funds]

$331,854Item
February 28, 2023

FACILITIES MANAGEMENT (FM) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM-BEHAVIORAL HEALTH: Riverside University Health System Arlington Campus Inpatient Treatment Facility Roofing Repair Project – California Environmental Quality Act Exempt, Approval of In-Principle, Preliminary Project Budget, and Construction Contract with Vincor Construction, Inc. District 1. [$607,862 - 52% State Funds, 48% Federal Funds]

[$607,862 - 52% State Funds, 48% Federal Funds]

$607,862Item
November 29, 2022

FACILITIES MANAGEMENT (FM) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Medical Center Radiology Rooms F1068/1046 Computerized Tomography Scanner Replacement Project - Approval of Project Budget and Construction Contract with Vincor Construction, Inc., District 5. [Total Cost $3,646,894 - 100% RUHS Enterprise Fund 40050]

[Total Cost $3,646,894 - 100% RUHS Enterprise Fund 40050]

$3,646,894Item
November 29, 2022

FACILITIES MANAGEMENT (FM) AND TRANSPORTATION AND LAND MANAGEMENT AGENCY (TLMA) AND ASSESSOR-COUNTY CLERK-RECORDER: Riverside County Administrative Center Transportation and Land Management Agency and Assessor-County Clerk-Recorder 2nd Floor Tenant Improvement Project – Approval of Project Budget and Construction Contract with Vincor Construction, Inc., District 2. [$5,607,223 – 33.43% Proceeds From Sale of County Property Fund 11183, 39.57% Assessor-County Clerk-Recorder Department Conversion F

[$5,607,223 – 33.43% Proceeds From Sale of County Property Fund 11183, 39.57% Assessor-County Clerk-Recorder Department Conversion Fund 11077, 27% Transportation and Land Management Agency Department Fund 20200]

$5,607,223Item
November 8, 2022

SHERIFF-CORONER-PA: Low Voltage/Key Card Access Upgrades at Multiple Sheriff’s Facilities Project – and Approval for a Supplemental Change Order for Vincor Construction, Inc., Districts 1, 3, 4 and 5. [Total Amount - $126,131 100% Sheriff's Budget] Continued to November 29, 2022

[Total Amount - $126,131 100% Sheriff's Budget]

$126,131Item
November 8, 2022

SHERIFF-CORONER-PA: Tenant Improvements at Multiple Sheriff’s Facilities Projects –and Approval for Two (2) Supplemental Change Orders for Vincor Construction, Inc., Districts 1, 3, 4 and 5. [Total Amount - $432,470 – 100% Sheriff’s Booking Recovery Fund] Continued to November 29, 2022

[Total Amount - $432,470 – 100% Sheriff’s Booking Recovery Fund]

$432,470Item
November 1, 2022

FACILITIES MANAGEMENT(FM): Approval of United States District Court Lease Amendment No. 2 for Audio/Visual Infrastructure Upgrade Project (Project), Approval of In-Principle, Preliminary Project Budget, and Construction Contract with Vincor Construction, Inc.; CEQA Exempt; District 2 [$1,396,820 - 100% USDC Lease Payments through GSA Reimbursed by Federal GSA Administration Fund]

[$1,396,820 - 100% USDC Lease Payments through GSA Reimbursed by Federal GSA Administration Fund]

$1,396,820Item
October 18, 2022

SHERIFF-CORONER-PA: Tenant Improvements at Multiple Sheriff’s Facilities Projects –and Approval for Two (2) Supplemental Change Orders for Vincor Construction, Inc., Districts 1, 3, 4 and 5. [Total Amount - $432,470 – 100% Sheriff’s Booking Recovery Fund]

[Total Amount - $432,470 – 100% Sheriff’s Booking Recovery Fund]

$432,470Item
October 18, 2022

SHERIFF-CORONER-PA: Low Voltage/Key Card Access Upgrades at Multiple Sheriff’s Facilities Project – and Approval for a Supplemental Change Order for Vincor Construction, Inc., Districts 1, 3, 4 and 5. [Total Amount - $126,131 100% Sheriff's Budget]

[Total Amount - $126,131 100% Sheriff's Budget]

$126,131Item
September 20, 2022

FACILITIES MANAGEMENT (FM) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Medical Center Angiography Suite Renovation Project - Approval of Project Budget and Construction Contract with Vincor Construction, Inc., District 5. [$2,565,062, 100% RUHS Enterprise Fund 40050]

[$2,565,062, 100% RUHS Enterprise Fund 40050]

$2,565,062Item
August 2, 2022

FACILITIES MANAGEMENT (FM) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Inpatient Treatment Facility - Security System Upgrade Project - California Environmental Quality Act Exempt, Approval of In-Principle, Preliminary Project Budget, and Construction Contract with Vincor Construction, Inc., District 1. [$1,915,470, 100% RUHS Enterprise Fund 40050]

[$1,915,470, 100% RUHS Enterprise Fund 40050]

$1,915,470Item
April 26, 2022

FACILITIES MANAGEMENT AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Medical Center Labor & Delivery Room, Neonatal Intensive Care Unit, and Pediatrics Accessibility and Wayfinding Project - California Environmental Quality Act Exempt, Approval of In-Principle, Preliminary Project Budget, and Approval of Construction Contract with Vincor Construction, Inc., District 5. [$1,623,070 - 100 % RUHS Enterprise Fund 40050]

[$1,623,070 - 100 % RUHS Enterprise Fund 40050]

$1,623,070Item
August 17, 2021

SHERIFF-CORONER-PA: Approve the Closed-Circuit Road (EVOC training) at Ben Clark Training Center (BCTC) Project – California Environmental Quality Act Exempt, Approval of In-Principle, Preliminary Project Budget and Construction Contract with Vincor Construction, Inc., District 1. [Total Cost - $181,828; 100% Sheriff’s Budget]

[Total Cost - $181,828; 100% Sheriff’s Budget]

$181,828Item
July 20, 2021

FACILITIES MANAGEMENT (FM) AND PROBATION DEPARTMENT: Southwest Juvenile Hall Freezer/Refrigerator Replacement Project - California Environmental Quality Act Exempt, Approval of In-Principle, Project Budget and Construction Contract with Vincor Construction, Inc., District 2. [$141,130, 100% Probation Department Budget-General Fund]

[$141,130, 100% Probation Department Budget-General Fund]

$141,130Item
June 8, 2021

SHERIFF'S DEPARTMENT: Tenant Improvements at Multiple Sheriff’s Facilities Projects – California Environmental Quality Act Exempt, Approval of In-Principle, Preliminary Project Budget and Construction Contract with Vincor Construction, Inc., Districts 1, 3, 4 and 5. [$5,411,735 - 50% Sheriff's Booking Recovery Fund and 50% CARES Act Funds] Pulled Item

[$5,411,735 - 50% Sheriff's Booking Recovery Fund and 50% CARES Act Funds]

$5,411,735Item
June 8, 2021

SHERIFF'S DEPARTMENT: Removal/Replacement of Inmate Shower and Plumbing/Restroom Improvement Projects – California Environmental Quality Act Exempt, Approval of In-Principle, Preliminary Project Budget and Construction Contract with Vincor Construction, Inc., District 1, 3 and 5. [$5,490,478 - 100% Reimbursed by CARES Act] Pulled Item

[$5,490,478 - 100% Reimbursed by CARES Act]

$5,490,478Item
June 8, 2021

FACILITIES MANAGEMENT (FM): United States Bankruptcy Court Lease Agreement Finishes Replacement Project - Approval of Construction Contract with Vincor Construction, Inc., District 2. [Total Cost $1,701,638 - Lease Payments from General Services Administration - 100%]

[Total Cost $1,701,638 - Lease Payments from General Services Administration - 100%]

$1,701,638Item