The totals are the county checkbook, grouped by department and account. Payment lines are the individual rows behind that total: date, fund, account, description, and invoice. A Board agenda item is listed when its title names this party. The agenda is the board’s record. The checkbook is the payment record. They are not the same document.
By department
| Department | Account | Paid | Payments |
|---|---|---|---|
| Facilities Management | Capital Assets | $3,241,117 | 16 |
| Sheriff Dept | Capital Assets | $1,863,246 | 4 |
| County Service Areas | Services and Support | $180,267 | 1 |
| Sheriff Dept | Services and Support | $25,915 | 2 |
| Edward Dean Museum | Capital Assets | $10,996 | 1 |
Payment lines
The latest payments in fiscal year 2027. Checkbook rows
| Date | Department | Fund | Account | Description | Invoice | Amount |
|---|---|---|---|---|---|---|
| October 23, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | APPLICATION NO 13_3984.00 | $391,961 | |
| October 23, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | APPLICATION NO 12_3984.00 | $40,749 | |
| October 22, 2026 | Edward Dean Museum | 21735 ARP Act Coronavirus Relief | Buildings-Capital Projects | 9 | $508,250 | |
| October 22, 2026 | County Service Areas | 21735 ARP Act Coronavirus Relief | Improvements-Infrastructure | Application No.6 RET | $63,623 | |
| October 22, 2026 | Edward Dean Museum | 21735 ARP Act Coronavirus Relief | Buildings-Capital Projects | 10 RET | $294,446 | |
| October 22, 2026 | County Service Areas | 21735 ARP Act Coronavirus Relief | Improvements-Infrastructure | Application No.5 | $68,844 | |
| October 21, 2026 | Economic Development Agency | 21735 ARP Act Coronavirus Relief | Project Cost Expenses | 9 | $2,207,905 | |
| October 21, 2026 | Economic Development Agency | 21735 ARP Act Coronavirus Relief | Project Cost Expenses | 9 | $2,207,905 | |
| October 15, 2026 | Economic Development Agency | 21735 ARP Act Coronavirus Relief | Project Cost Expenses | 8 | $380,935 | |
| October 15, 2026 | Economic Development Agency | 21735 ARP Act Coronavirus Relief | Project Cost Expenses | 8 | $380,935 | |
| October 15, 2026 | County Service Areas | 21735 ARP Act Coronavirus Relief | Improvements-Infrastructure | Application No.4 | $55,534 | |
| October 1, 2026 | County Service Areas | 21735 ARP Act Coronavirus Relief | Improvements-Infrastructure | Application No.3 | $518,741 | |
| September 28, 2026 | Sheriff Dept | 10000 General Fund | Improvements-Building | RSO-PMO-21-089-18 | $277,484 | |
| September 21, 2026 | Sheriff Dept | 10000 General Fund | Improvements-Building | RSO-PMO-22-188-16 | $448,214 | |
| September 21, 2026 | Edward Dean Museum | 21735 ARP Act Coronavirus Relief | Buildings-Capital Projects | 8 | $216,098 | |
| September 14, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | APPLICATION NO 5_1497 | $458,677 | |
| September 14, 2026 | Economic Development Agency | 21735 ARP Act Coronavirus Relief | Project Cost Expenses | 7 | $135,409 | |
| September 14, 2026 | Economic Development Agency | 21735 ARP Act Coronavirus Relief | Project Cost Expenses | 7 | $135,409 | |
| September 14, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | APPLICATION NO 7_3735 | $27,173 | |
| September 14, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | APPLICATION NO 2_3735 | $1,680 | |
| September 9, 2026 | Sheriff Dept | 10000 General Fund | Improvements-Building | RSO-PMO-21-089-16 | $733,314 | |
| September 9, 2026 | Sheriff Dept | 10000 General Fund | Improvements-Building | RSO-PMO-21-089-17 | $468,537 | |
| September 9, 2026 | Sheriff Dept | 10000 General Fund | Improvements-Building | RSO-PMO-22-167-3 | $317,636 | |
| September 1, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | APPLICATION NO 2_RET_3870.03 | $190 | |
| August 19, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | APPLICATION NO 8_1492.00 | $32,644 | |
| August 19, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | APPLICATION NO 3_4548.00 | $67,243 | |
| August 18, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | APPLICATION NO 4_1497 | $749,124 | |
| August 18, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | APPLICATION NO 1_3870.03 | $3,610 | |
| August 18, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | APPLICATION NO 1_3735.01 | $31,928 | |
| August 17, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | APPLICATION NO 1_4808.00 | $163,386 | |
| August 17, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | APPLICATION NO 1_4523.00 | $48,997 | |
| August 12, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | APPLICATION NO 2RET_1492.01 | $5,383 | |
| August 12, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | APPLICATION NO 2RET_1492.02 | $413 | |
| August 4, 2026 | Sheriff Dept | 10000 General Fund | Improvements-Building | RSO-PMO-21-089-14 | $1,031,442 | |
| August 1, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | APPLICATION NO 2 RET_3870 | $26,872 | |
| August 1, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | APPLICATION NO 2_4548.00 | $203,776 | |
| August 1, 2026 | Sheriff Dept | 10000 General Fund | Equipment-Other | RSO-PMO-24-125-1 | $230,117 | |
| August 1, 2026 | Facilities Management | 30100 Capital Const-Land & Bldg Acq | Buildings-Capital Projects | APPLICATION NO 1_4548.00 | $41,576 | |
| July 22, 2026 | Sheriff Dept | 10000 General Fund | Maint-Building and Improvement | RSO-PMO-24-123-2 | $23,447 | |
| July 22, 2026 | Sheriff Dept | 10000 General Fund | Improvements-Building | RSO-PMO-22-167-2 | $233,022 |
Board items naming this vendor
| Date | Item | Amount | Agenda |
|---|---|---|---|
| October 20, 2026 | OFFICE OF ECONOMIC DEVELOPMENT: CSA 122 Mesa Verde Water Reservoir Replacement Project– Approval of the Notice of Completion with Vincor Construction, Inc., District 4. [$83,586 - 100% American Rescue Plan Act (previously approved budget)] (4/5th Vote Required) [$83,586 - 100% American Rescue Plan Act (previously approved budget)] | — | Item |
| October 20, 2026 | OFFICE OF ECONOMIC DEVELOPMENT: Business Revitalization Program– Approval of the Notice of Completion with Vincor Construction, Inc., All Districts. [$239,662 - 100% American Rescue Plan Act (previously approved budget)] (4/5th Vote Required) [$239,662 - 100% American Rescue Plan Act (previously approved budget)] | — | Item |
| June 23, 2026 | FACILITIES MANAGEMENT (FM) AND TREASURER-TAX COLLECTOR: Treasurer-Tax Collector 4th Floor Restroom, Breakroom and Conference Room Renovation Project – Approval of Revised Project Budget and Notice of Completion for Vincor Construction, Inc; District 1. [$6,870 - 100% Treasurer-Tax Collector General Fund 10000] (Clerk to Record Notice of Completion) [$6,870 - 100% Treasurer-Tax Collector General Fund 10000] | $6,870 | Item |
| April 14, 2026 | OFFICE OF ECONOMIC DEVELOPMENT: Home Gardens Library Refresh Project, Phase 1 - Approval of Notice of Completion with Vincor Construction, Inc., District 2. [$27,948 - 100% ARPA (Previously Approved Budget)] (Clerk to Record Notice of Completion) [$27,948 - 100% ARPA (Previously Approved Budget)] | — | Item |
| January 27, 2026 | Riverside University Health System- Medical Center: Nurse Call System Replacement Project - Approve Notice of Completion for Vincor Construction, Inc. for Riverside University Health System Medical Center Wide Nurse Call System Replacement Project, Phase 1, 2nd Floor, Approval of Revised Project Budget, and Approval of the Construction Contract with Vincor Construction, Inc. for Riverside University Health System Medical Center Wide Nurse Call System Replacement Project, Phase 2, 3rd and 4th Flo [$7,922,262 - 100% RUHS Enterprise Fund 40050] | $7,922,262 | Item |
| August 26, 2025 | FACILITIES MANAGEMENT (FM) AND RIVERSIDE COUNTY FIRE DEPARTMENT: Riverside County Fire Department Winchester Station 34 Expansion Project – Approval of Revised Project Budget and Approval of Construction Contract with Vincor Construction, Inc., District 3. [$1,553,843 - 100% DIF Western Riverside County Fire Facility Fund 30505] [$1,553,843 - 100% DIF Western Riverside County Fire Facility Fund 30505] | $1,553,843 | Item |
| July 29, 2025 | OFFICE OF ECONOMIC DEVELOPMENT: Woodcrest Community Park Improvement Project – Approval of Notice of Completion with Vincor Construction, Inc., District 2. [$35,946.29 - 100%-County Service Area 152 Zone B Quimby Fund 32740 (Previously approved budget)] (Clerk to Record Notice of Completion) [$35,946.29 - 100%-County Service Area 152 Zone B Quimby Fund 32740 (Previously approved budget)] | — | Item |
| May 20, 2025 | FACILITIES MANAGEMENT (FM), AUDITOR-CONTROLLER’S OFFICE (ACO), AND RIVERSIDE COUNTY INFORMATION TECHNOLOGY: Riverside County Administrative Center Auditor-Controller 6th Floor Tenant Improvement Project - Approval of Revised Project Budget, Approval to Increase Purchase Order ITARC-0000018439 for Semetra Cutting Edge Solutions, and Approval of Change Order No. 2 and Notice of Completion for Vincor Construction, Inc.; District 1. [$275,153 – 100% Capital Improvement Program Fund 30700] (Clerk to [$275,153 – 100% Capital Improvement Program Fund 30700] | $275,153 | Item |
| February 25, 2025 | FACILITIES MANAGEMENT (FM) AND TRANSPORTATION AND LAND MANAGEMENT AGENCY (TLMA) AND ASSESSOR-COUNTY CLERK-RECORDER: Riverside County Administrative Center Transportation and Land Management Agency and Assessor-County Clerk-Recorder 2nd Floor Tenant Improvement Project – Approval of Revised Project Budget, Approval of Change Order No. 4 and Notice of Completion for Vincor Construction, Inc., District 1. [$90,000 Total Cost: $30,600 - 34% Transportation and Land Management Agency Department Fund 2 [$90,000 Total Cost: $30,600 - 34% Transportation and Land Management Agency Department Fund 20200, $27,900 – 31% Deferred Maintenance Fund 11208, $31,500 - 35% Assessor-County Clerk Recorder Conversion Fund 11077] | $90,000 | Item |
| December 17, 2024 | SHERIFF-CORONER-PA: Palm Desert- Dispatch Expansion Project, Project No. RSO-PMO-22-188, Approval of In-Principle, Preliminary Project Budget and Construction Contract with Vincor Construction, Inc., All Districts. [Total Cost - $17,818,530 52% Sheriff’s Budget, 48% previously approved Development Impact Fees (DIF)] [Total Cost - $17,818,530 52% Sheriff’s Budget, 48% previously approved Development Impact Fees (DIF)] | — | Item |
| December 3, 2024 | SHERIFF-CORONER-PA: Larry D. Smith Correctional Facility (SCF) Kitchen Modernization Project, California Environmental Quality Act Exempt per State CEQA Guidelines Sections 15301, 15302, and 15061(b)(3), Approval of In-Principle, Preliminary Project Budget and Construction Contract with Vincor Construction, Inc., All Districts. [Total Cost - $10,735,940 – 73.4% Sheriff’s Budget, 26.6% Capital Projects Fund 30704] [Total Cost - $10,735,940 – 73.4% Sheriff’s Budget, 26.6% Capital Projects Fund 30704] | $10,735,940 | Item |
| December 3, 2024 | OFFICE OF ECONOMIC DEVELOPMENT: CSA 122 Mesa Verde Water Reservoir Replacement Project – Approval of In-Principle, Approval of Construction Contract with Vincor Construction, Inc., and Total Project Budget. District 4. [$1,422,201 - 100%- ARPA Fund 21735] (CEQA Exempt) (4/5 Vote Required) [$1,422,201 - 100%- ARPA Fund 21735] | $1,422,201 | Item |
| November 5, 2024 | FACILITIES MANAGEMENT (FM) AND RIVERSIDE COUNTY FIRE DEPARTMENT: Riverside County Fire Department Station 82 Expansion Project - Approval of Additional Funds to Establish a Project Budget, and Approval of Construction Contract with Vincor Construction, Inc.; District 2. [$4,500,000 - 57% Federal Funds - American Rescue Plan Act (ARPA) Fund 21735; 43% Fire Department Budget General Fund 10000](4/5 Vote Required) [$4,500,000 - 57% Federal Funds - American Rescue Plan Act (ARPA) Fund 21735; 43% Fire Department Budget General Fund 10000] | $4,500,000 | Item |
| September 17, 2024 | FACILITIES MANAGEMENT (FM) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Inpatient Treatment Facility - Security System Upgrade Project - Approval of Revised Project Budget and Approval of Change Order No. 1 for Vincor Construction, Inc.; District 1. [$255,170, 100% RUHS Enterprise Fund 40050](4/5 Vote Required) [$255,170, 100% RUHS Enterprise Fund 40050] | $255,170 | Item |
| July 30, 2024 | OFFICE OF ECONOMIC DEVELOPMENT: Woodcrest Community Park Improvement Project, Phase 1 – Approval of Construction Contract with Vincor Construction, Inc. District 2. [$698,820 100%-County Service Area 152 Cajalco Corridor Quimby Fund 32740 (Previously approved budget)] Pulled Item [$698,820 100%-County Service Area 152 Cajalco Corridor Quimby Fund 32740 (Previously approved budget)] | — | Item |
| July 2, 2024 | OFFICE OF ECONOMIC DEVELOPMENT: Riverside County Home Gardens Library Refresh Project, Phase 1 – Approval of Construction Contract with Vincor Construction, Inc., District 2. [$550,000 100% ARPA (Previously approved budget)] [$550,000 100% ARPA (Previously approved budget)] | — | Item |
| May 21, 2024 | FACILITIES MANAGEMENT AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Medical Center - Riverside University Health System Medical Center Wide Nurse Call System Replacement Project, Phase 1, 2nd Floor - Approval of the Construction Contract with Vincor Construction, Inc.; District 5. [$928,722 - 100% RUHS Enterprise Fund 40050] (Previously Approved Budget) [$928,722 - 100% RUHS Enterprise Fund 40050] | — | Item |
| January 30, 2024 | FACILITIES MANAGEMENT (FM) AND AUDITOR-CONTROLLER (ACO): Riverside County Administrative Center Auditor-Controller 6th Floor Tenant Improvement Project - Approval of the Construction Contract with Vincor Construction, Inc.; District 1. [$3,794,538 - 100% Capital Improvement Program Fund 30700] (Previously Approved Budget) [$3,794,538 - 100% Capital Improvement Program Fund 30700] | — | Item |
| October 31, 2023 | FACILITIES MANAGEMENT (FM) AND TRANSPORTATION AND LAND MANAGEMENT AGENCY (TLMA): Transportation and Land Management Agency Elevator Fire Damage Emergency Repair Project - Approval of Revised Project Budget, Ratify and Approve Change Order No. 1 and Approve Notice of Completion for Vincor Construction, Inc.; District 1. [Total Cost $158,517– 42% TLMA Local Transportation Fund 20000, 58% County Insurance Carrier Funds] (Clerk to Record Notice of Completion) (4/5 Vote Required) [Total Cost $158,517– 42% TLMA Local Transportation Fund 20000, 58% County Insurance Carrier Funds] | $158,517 | Item |
| October 3, 2023 | FACILITIES MANAGEMENT (FM) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM - BEHAVIORAL HEALTH: 3125 Myers Street Roof Replacement Project – Approval of Construction Contract with Vincor Construction, Inc., District 1. [$1,198,359 - 100% RUHS Behavioral Health General Fund 10000 (84.8% State and 15.2% Facility Renewal funding)] (Previously approved budget) [$1,198,359 - 100% RUHS Behavioral Health General Fund 10000 (84.8% State and 15.2% Facility Renewal funding)] | — | Item |
| September 26, 2023 | FACILITIES MANAGEMENT (FM) AND PROBATION DEPARTMENT: Riverside County Probation Department County Farm Road Remodel Project – Approval of Revised Project Budget and Construction Contract with Vincor Construction, Inc.; District 1. [$548,879 – 100% Probation Department General Fund 10000] [$548,879 – 100% Probation Department General Fund 10000] | $548,879 | Item |
| September 12, 2023 | OFFICE OF ECONOMIC DEVELOPMENT: American Rescue Plan Act Business Revitalization Program - Approval of Construction Contract with Vincor Construction, Inc., All Districts. [$4,300,000 - 100% ARPA (previously approved budget)] Pulled Item [$4,300,000 - 100% ARPA (previously approved budget)] | — | Item |
| May 9, 2023 | FACILITIES MANAGEMENT(FM): United States District Court Lease Agreement Replacement Project - Approval of Construction Contract with Vincor Construction, Inc.; District 1. [$862,353 - 100% USDC Lease Payments through General Services Administration (GSA) Reimbursed by Federal GSA Funds (Previously approved budget)] [$862,353 - 100% USDC Lease Payments through General Services Administration (GSA) Reimbursed by Federal GSA Funds (Previously approved budget)] | — | Item |
| May 2, 2023 | FACILITIES MANAGEMENT (FM) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM - BEHAVIORAL HEALTH: Riverside University Health System Behavioral Health Roy's Desert Springs Emergency Generator Project – Approval of Change Order No. 1 for Vincor Construction, Inc. and Approval of Revised Project Budget, District 4. [$331,854 - 100% RUHS Behavioral Health Department Budget - General Fund 10000 - State Funds] [$331,854 - 100% RUHS Behavioral Health Department Budget - General Fund 10000 - State Funds] | $331,854 | Item |
| February 28, 2023 | FACILITIES MANAGEMENT (FM) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM-BEHAVIORAL HEALTH: Riverside University Health System Arlington Campus Inpatient Treatment Facility Roofing Repair Project – California Environmental Quality Act Exempt, Approval of In-Principle, Preliminary Project Budget, and Construction Contract with Vincor Construction, Inc. District 1. [$607,862 - 52% State Funds, 48% Federal Funds] [$607,862 - 52% State Funds, 48% Federal Funds] | $607,862 | Item |
| November 29, 2022 | FACILITIES MANAGEMENT (FM) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Medical Center Radiology Rooms F1068/1046 Computerized Tomography Scanner Replacement Project - Approval of Project Budget and Construction Contract with Vincor Construction, Inc., District 5. [Total Cost $3,646,894 - 100% RUHS Enterprise Fund 40050] [Total Cost $3,646,894 - 100% RUHS Enterprise Fund 40050] | $3,646,894 | Item |
| November 29, 2022 | FACILITIES MANAGEMENT (FM) AND TRANSPORTATION AND LAND MANAGEMENT AGENCY (TLMA) AND ASSESSOR-COUNTY CLERK-RECORDER: Riverside County Administrative Center Transportation and Land Management Agency and Assessor-County Clerk-Recorder 2nd Floor Tenant Improvement Project – Approval of Project Budget and Construction Contract with Vincor Construction, Inc., District 2. [$5,607,223 – 33.43% Proceeds From Sale of County Property Fund 11183, 39.57% Assessor-County Clerk-Recorder Department Conversion F [$5,607,223 – 33.43% Proceeds From Sale of County Property Fund 11183, 39.57% Assessor-County Clerk-Recorder Department Conversion Fund 11077, 27% Transportation and Land Management Agency Department Fund 20200] | $5,607,223 | Item |
| November 8, 2022 | SHERIFF-CORONER-PA: Low Voltage/Key Card Access Upgrades at Multiple Sheriff’s Facilities Project – and Approval for a Supplemental Change Order for Vincor Construction, Inc., Districts 1, 3, 4 and 5. [Total Amount - $126,131 100% Sheriff's Budget] Continued to November 29, 2022 [Total Amount - $126,131 100% Sheriff's Budget] | $126,131 | Item |
| November 8, 2022 | SHERIFF-CORONER-PA: Tenant Improvements at Multiple Sheriff’s Facilities Projects –and Approval for Two (2) Supplemental Change Orders for Vincor Construction, Inc., Districts 1, 3, 4 and 5. [Total Amount - $432,470 – 100% Sheriff’s Booking Recovery Fund] Continued to November 29, 2022 [Total Amount - $432,470 – 100% Sheriff’s Booking Recovery Fund] | $432,470 | Item |
| November 1, 2022 | FACILITIES MANAGEMENT(FM): Approval of United States District Court Lease Amendment No. 2 for Audio/Visual Infrastructure Upgrade Project (Project), Approval of In-Principle, Preliminary Project Budget, and Construction Contract with Vincor Construction, Inc.; CEQA Exempt; District 2 [$1,396,820 - 100% USDC Lease Payments through GSA Reimbursed by Federal GSA Administration Fund] [$1,396,820 - 100% USDC Lease Payments through GSA Reimbursed by Federal GSA Administration Fund] | $1,396,820 | Item |
| October 18, 2022 | SHERIFF-CORONER-PA: Tenant Improvements at Multiple Sheriff’s Facilities Projects –and Approval for Two (2) Supplemental Change Orders for Vincor Construction, Inc., Districts 1, 3, 4 and 5. [Total Amount - $432,470 – 100% Sheriff’s Booking Recovery Fund] [Total Amount - $432,470 – 100% Sheriff’s Booking Recovery Fund] | $432,470 | Item |
| October 18, 2022 | SHERIFF-CORONER-PA: Low Voltage/Key Card Access Upgrades at Multiple Sheriff’s Facilities Project – and Approval for a Supplemental Change Order for Vincor Construction, Inc., Districts 1, 3, 4 and 5. [Total Amount - $126,131 100% Sheriff's Budget] [Total Amount - $126,131 100% Sheriff's Budget] | $126,131 | Item |
| September 20, 2022 | FACILITIES MANAGEMENT (FM) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Medical Center Angiography Suite Renovation Project - Approval of Project Budget and Construction Contract with Vincor Construction, Inc., District 5. [$2,565,062, 100% RUHS Enterprise Fund 40050] [$2,565,062, 100% RUHS Enterprise Fund 40050] | $2,565,062 | Item |
| August 2, 2022 | FACILITIES MANAGEMENT (FM) AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Inpatient Treatment Facility - Security System Upgrade Project - California Environmental Quality Act Exempt, Approval of In-Principle, Preliminary Project Budget, and Construction Contract with Vincor Construction, Inc., District 1. [$1,915,470, 100% RUHS Enterprise Fund 40050] [$1,915,470, 100% RUHS Enterprise Fund 40050] | $1,915,470 | Item |
| April 26, 2022 | FACILITIES MANAGEMENT AND RIVERSIDE UNIVERSITY HEALTH SYSTEM: Riverside University Health System Medical Center Labor & Delivery Room, Neonatal Intensive Care Unit, and Pediatrics Accessibility and Wayfinding Project - California Environmental Quality Act Exempt, Approval of In-Principle, Preliminary Project Budget, and Approval of Construction Contract with Vincor Construction, Inc., District 5. [$1,623,070 - 100 % RUHS Enterprise Fund 40050] [$1,623,070 - 100 % RUHS Enterprise Fund 40050] | $1,623,070 | Item |
| August 17, 2021 | SHERIFF-CORONER-PA: Approve the Closed-Circuit Road (EVOC training) at Ben Clark Training Center (BCTC) Project – California Environmental Quality Act Exempt, Approval of In-Principle, Preliminary Project Budget and Construction Contract with Vincor Construction, Inc., District 1. [Total Cost - $181,828; 100% Sheriff’s Budget] [Total Cost - $181,828; 100% Sheriff’s Budget] | $181,828 | Item |
| July 20, 2021 | FACILITIES MANAGEMENT (FM) AND PROBATION DEPARTMENT: Southwest Juvenile Hall Freezer/Refrigerator Replacement Project - California Environmental Quality Act Exempt, Approval of In-Principle, Project Budget and Construction Contract with Vincor Construction, Inc., District 2. [$141,130, 100% Probation Department Budget-General Fund] [$141,130, 100% Probation Department Budget-General Fund] | $141,130 | Item |
| June 8, 2021 | SHERIFF'S DEPARTMENT: Tenant Improvements at Multiple Sheriff’s Facilities Projects – California Environmental Quality Act Exempt, Approval of In-Principle, Preliminary Project Budget and Construction Contract with Vincor Construction, Inc., Districts 1, 3, 4 and 5. [$5,411,735 - 50% Sheriff's Booking Recovery Fund and 50% CARES Act Funds] Pulled Item [$5,411,735 - 50% Sheriff's Booking Recovery Fund and 50% CARES Act Funds] | $5,411,735 | Item |
| June 8, 2021 | SHERIFF'S DEPARTMENT: Removal/Replacement of Inmate Shower and Plumbing/Restroom Improvement Projects – California Environmental Quality Act Exempt, Approval of In-Principle, Preliminary Project Budget and Construction Contract with Vincor Construction, Inc., District 1, 3 and 5. [$5,490,478 - 100% Reimbursed by CARES Act] Pulled Item [$5,490,478 - 100% Reimbursed by CARES Act] | $5,490,478 | Item |
| June 8, 2021 | FACILITIES MANAGEMENT (FM): United States Bankruptcy Court Lease Agreement Finishes Replacement Project - Approval of Construction Contract with Vincor Construction, Inc., District 2. [Total Cost $1,701,638 - Lease Payments from General Services Administration - 100%] [Total Cost $1,701,638 - Lease Payments from General Services Administration - 100%] | $1,701,638 | Item |
Sources